Customization: | Available |
---|---|
After-sales Service: | Provided |
Warranty: | 1 Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
CWD300 Multi-functional track mounted water well drilling rigCWD2600 Multi-functional track mounted water well drilling rig is a efficient,multifunction full hydraulic water well drilling rig.It is high efficiency because of having a larger torque of the turntable and is mainly used for water well in industry and agriculture, national defense buildingfoundation, geological exploration, geothermic well and other foundation working, it is popular at home and abroad.
CWD2600 crawler mounted drilling rig can drilling in all kinds formations by mud drilling in soft formation and air DTH hammer in rock drilling,DTH Hammer is applied in rock drilling, slag is discharged by air pressure and the offstage efficiency is ten times than traditional rotary drilling.
CWD2600 deep water well drilling rigs, in cutting drilling or rotary drilling can be operated in unconsolidated layer, and the slag can be discharged under by mud, the impact drilling operation can also be adopted and slag can be discharged by pressure air, the hydraulic water well drilling rig suitable for
>> The drilling rig can use air DTH Hammer drilling and mud drilling.
>> Centralized control console is suitable for each manipulation and control. Rapid pulling and lifting reduce the auxiliary time and enhance the work efficiency.
>> The main drive system, the transfer case, gearbox, double-winch unit, mud pump, turntable,drilling tower, feed system are set up on the chassis.
>> It's a hydraulicrotary drilling rig with directional circulation. It can work with BW850/5 or BW1500/12 mud pump which adopts the slurry as the washing fluid and can drill on clay, sand and rock if it is equipped with suitable drilling bit.
>> The power of drilling rig comes from a Weichai engine,220kw Yuchai engine drives the large displacement high pressure plunger pump and it is characterized by powerful dynamic and stable performance.
Specification
|
Unit
|
CWD2600
|
Geology Drilled
|
|
f=6-20
|
Working Air Pressure
|
|
1.05~35Mpa
|
Air Consumption
|
|
16~180m³/Min
|
Feed Speed
|
|
10-25m/h
|
Applicable Conditions
|
|
Soft& Hard Formation
|
Drilling Type
|
|
DTH& Mud Rotary
|
Applicable DTH Hammer
|
|
High Pressure
|
Max. Drilling Depth
|
m
|
2600
|
Max. Drilling Diameter
|
mm
|
140-1200
|
Power System
|
|
|
Rated Power
|
KW
|
410
|
Rated Speed
|
R/Min
|
1800
|
Feed System
|
|
|
Lifting Force
|
KN
|
1360
|
Slow Lifting Speed
|
M/MIN
|
2.2
|
Fast Lifting Speed
|
M/MIN
|
18
|
Light Load Lifting Speed
|
M/MIN
|
42
|
Axis Pressure
|
KN
|
0-420(adjustable)
|
Reverse Axis Pressure
|
KN
|
0-1600(adjustable)
|
Slow Lowering Speed
|
M/MIN
|
0.5-4.2(adjustable)
|
Fast Lowering Speed
|
M/MIN
|
38
|
Rotary Head Stroke
|
mm
|
14000
|
Rotation System
|
|
|
Torque(Reverse/ Forward)
|
N.M
|
40000/36000
|
Speed
|
R/Min
|
0-95
|
Hydraulic Clamp
|
|
|
Clamping Diameter
|
MM
|
φ102-φ273
|
Tool Winch
|
|
|
Lifting Force
|
KN
|
25
|
Wire Rope Length
|
M
|
60
|
Lifting Force
|
KN
|
80
|
Wire Rope Length
|
M
|
60
|
Hammer Lubrication
|
|
|
Displacement
|
L/MIN
|
0.1-0.4(adjustable)
|
Total Capacity
|
L
|
90
|
Max. Pressure
|
MPA
|
20
|
Foam Pump System
|
|
|
Displacement
|
L/MIN
|
35
|
Max. Pressure
|
MPA
|
15
|
Travel System
|
|
|
Travel Speed
|
KM/H
|
5
|
Gradability
|
°
|
21
|
Drill Pipe Diameter
|
MM
|
φ114/φ127/φ133mm
|
Drill Pipe Length
|
MM
|
6000-9600
|
Leg Stroke
|
MM
|
1700
|
Dimension& Weight
|
|
|
Shipping Dimension
|
|
|
L*W*H
|
MM
|
13900*2900*3800
|
Net Weight
|
TON
|
45
|
Q: Are you original manufacturer? |
Q: Which payment terms are available to us? |
Q: Which Incoterms 2010 terms can we work? |
A: Yes, we JCDRILL is a official leading manufacture in drilling machinery in China and we have the whole series products you need. |
A: T/T term or L/C term. On T/T term, 30% down payment is required in advance, and 70% balance shall be settled before shipment. On L/C term, a 100% irrevocable L/C without "soft clauses" can be accepted. |
A: We JCDRILL are a professional and international company, accept all Incoterms 2010 terms, normally we work on FOB, CIF, CFR, CIP. |
Q: How long will the delivery time take? |
Q: How about after sales service? |
Q:Spare Parts When You Need Them |
A: Normally mud pump products will take about 3-15 days to produce the ordered machines. Most of the time, we can have an immediate delivery of our regular machines in 15 days. |
A: 365×24 Year-round Service |
A:We have spare parts centers across continents that stock specialist spare parts. We promise that spare parts will be delivered within 72 hours or no more than one week. |