Customization: | Available |
---|---|
After-sales Service: | Free-Service |
Warranty: | 1year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
TWD Series Multi-functional trailer mounted water well drilling rig is a efficient,multi-function full hydraulic water welldrilling rig.It is high efficiency because of having a larger torque of the turntable and is mainly used for water well in industry and agriculture, national defense building foundation, geological exploration, geothermic well and other foundation working, it is popular at home and abroad.
TWD series trailer mounted drilling rig can drilling in all kinds formations by mud drilling in soft formation and air DTH hammer in rock drilling,DTH Hammer is applied in rock drilling, slag is discharged by air pressure and the offstage efficiency is ten times than traditional rotary drilling.
TWD series deep water well drilling rigs, in cutting drilling or rotary drilling can be operated in unconsolidated layer, and the slag can be discharged under by mud, the impact drilling operation can also be adopted and slag can be discharged by pressure air, the hydraulic water well drilling rig suitable for drilling complicated geological conditions.
>> The rotary head,have two gear,rotation speed is 45-115rpm stepless adjustment and the rotary torque is 4200-5600Nm.
>> The pulling force can be regulated and controlled, which adapt the machine to deep hole drilling.
>> It can set up a generator which is convenient to welding or illuminate for work at night.
>> Main winch are available on the rig so it is high efficiency when the rig drill on mud rock and on the weathering formation.
>> The main drive of rig is hydrulic and the four landing legs and drilling tower are hydraulic controlled. Transfer case and mud pump clutch system are also hydraulic operated.
>> The tools winch winch is used for auxiliary lifting and casin.
>> The Hydraulic auxiliary functions are easy and efficient for guide extension, boom swing, boom lift, guide dumping.
>> Competitive in price, low cost of maintain.
77KW,4Cylinder,water cooling Diesel Engine
Famous Brand Hydraulic System
Big Torque
&
Fast Rotation Speed
Specification | Unit | TWD180 | TWD200 |
Geology drilled | All Kind | All Kind | |
Drilling Type | DTH&MUD | DTH&MUD | |
Drill system and operation | Hydraulic | Hydraulic | |
Hole Diameter | mm | Φ90-Φ305 | Φ90-Φ355 |
Hole Depth | m | 180 | 200 |
Rotation Torque | Nm | 4200-5600 | 4200-5600 |
Rotatin Speed | rpm | 45-115 | 0-115 |
Drill pipe diameter | mm | 76/89/102 | 76/89/102 |
Drill pipe length | mm | 3000 | 3000 |
Max.Feed Speed | M/min | 2-17 | 2-17 |
Max.lifting Speed | M/min | 1.5-12.4 | 1.5-12.4 |
Feed Stroke | mm | 350 | 350 |
Max.Pull back Capacity | T | 12 | 14 |
lifting force of Winch | T | 1.2(Optional) | 1.5 |
Engine | |||
Diesel Engine type | 4Cylinder,water cooling | 4Cylinder,water cooling | |
Diesel Engine Brand | Quanchai | Yuchai | |
Rated Horse power | Kw | 55 | 77 |
Compressor required (Optional) | |||
Pressure Required | Mpa | 15-30 | 15-30 |
Air consumption | m³/min | 1.5-2.5 | 1.5-2.5 |
Mud Pump(Optional/Separate) | |||
Model | BW250 | BW250/BW450 | |
Displacement | L/Min | 250/450 | |
Discharge pressure(Mpa) | Mpa | 2.5-7 | 2.5-7/2-5 |
Trailer | |||
Trailer Type | 4 wheels trailer,front wheels with steering | ||
Mobility | Towed by pickup or light truck | ||
Dimension | |||
Net Weight | T | 3750 | 4100 |
Shipping LXWXH | mm | 4000*1820*2150 | 4150*1850*2160 |
Ground Clearance | mm | 300 | 305 |
Q: Are you original manufacturer? |
Q: Which payment terms are available to us? |
Q: Which Incoterms 2010 terms can we work? |
A: Yes, we JCDRILL is a official leading manufacture in drilling machinery in China and we have the whole series products you need. |
A: T/T term or L/C term. On T/T term, 30% down payment is required in advance, and 70% balance shall be settled before shipment. On L/C term, a 100% irrevocable L/C without "soft clauses" can be accepted. |
A: We JCDRILL are a professional and international company, accept all Incoterms 2010 terms, normally we work on FOB, CIF, CFR, CIP. |
Q: How long will the delivery time take? |
Q: How about after sales service? |
Q:Spare Parts When You Need Them |
A: Normally mud pump products will take about 3-15 days to produce the ordered machines. Most of the time, we can have an immediate delivery of our regular machines in 15 days. |
A: 365×24 Year-round Service |
A:We have spare parts centers across continents that stock specialist spare parts. We promise that spare parts will be delivered within 72 hours or no more than one week. |
![]() TWD |
TWD![]() TWD |
![]() |