Certification: | CE, ISO 9001:2000, ISO 9001:2008 |
---|---|
Condition: | New |
Motor: | Diesel Engine |
Drill Hole Diameter: | 75-300mm |
Drill Hole Depth: | 30-200m |
Bit Type: | Drill Bit |
Customization: |
---|
Suppliers with verified business licenses
Specification | |
Description | JXY200C |
Drilling depth | 30-200m |
Drilling diameter | 300-75mm |
Max.Hole Diameter | 500mm |
Drilling Angel | 90-75° |
Mast height | 7000mm |
Mast effective height | 6500mm |
Kelly/active pipe | 59*53mm |
Weight(Without truck) | 1650kgs |
Spline | |
Structure | Ball bearing |
Spindle rotating speed | 64/128/287/557r/min |
Spindle stroke | 450mm |
Soline Max.Torque | 2400N.m |
Hoist | |
Max.Hoisting Capacity | 1800kgf |
Tight rope cubic caliber | 26mm |
Hoisting speed | 17,35,75,151r/s |
Wireline diameter | 12.5mm |
Main hoisting line capacity | 35m |
Power Unit | |
Model | ZS1115 desiel engine |
Rated power | 14.7kw/2200rpm |
Mud pump | |
Rated flow | 160L/min |
Rated pressure | 1.3Mpa |
Driving power | 5.15kw |
Main machine weight | 190kg |
Demension | 1110*725*965mm |
Drill Pipe | |
Drill pipe length | 4.2m |
Drill pipe diameter | 42/50/60mm |
Chassis | |
Model | 95Hp light truck |
Drive mode | 4X2 |
Power Model | ZS1115E2 |
Emission standard | Euro-5 |
Rated power | 70HP |
Rotating speed | 3200rpm |
Stabilizing Jack | |
2 front jacks and 2 rear jacks. | |
Type | Hydraulic |
Stroke | 350 mm |
Dimensions | |
Overall length | 6300 mm |
Overall width | 2200 mm |
Overall height | 3200 mm |
Certificate
FAQ Q: Are you original manufacturer?
A: Yes, we JCDRILL is a official leading manufacture in drilling machinery in China and we have
the whole series products you need.
Q: Which payment terms are available to us?
A: T/T term or L/C term. On T/T term, 30% down payment is required in advance, and 70% balance shall be settled before shipment.On L/C term, a 100% irrevocable L/C without "soft clauses" can be accepted.
Q: Which Incoterms 2010 terms can we work?
A: We JCDRILL are a professional and international company, accept all Incoterms 2010 terms, normally we work on FOB, CIF, CFR,CIP.
Q: How long will the delivery time take?
A: Normally mud pump products will take about 3-15 days to produce the ordered machines. Most of the time, we can have an immediate delivery of our regular machines in 15 days.
Q: How about after sales service?
A: 365×24 Year-round Service We are committed to year-round 24-hour service even during holidays, in line with our policy of always providing "a response within 15 minutes and job completion within 24 hours."
Q:Spare Parts When You Need Them
A:We have spare parts centers across continents that stock specialist spare parts. We promise that spare parts will be delivered within 72 hours or no more than one week.
Suppliers with verified business licenses