Customization: | Available |
---|---|
After-sales Service: | Product Warranty |
Warranty: | 1 Year/ 2000hours |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Specification | |
Description | JXY200C |
Drilling depth | 30-200m |
Drilling diameter | 300-75mm |
Max.Hole Diameter | 500mm |
Drilling Angel | 90-75° |
Mast height | 7000mm |
Mast effective height | 6500mm |
Kelly/active pipe | 59*53mm |
Weight(Without truck) | 1650kgs |
Spline | |
Structure | Ball bearing |
Spindle rotating speed | 64/128/287/557r/min |
Spindle stroke | 450mm |
Soline Max.Torque | 2400N.m |
Hoist | |
Max.Hoisting Capacity | 1800kgf |
Tight rope cubic caliber | 26mm |
Hoisting speed | 17,35,75,151r/s |
Wireline diameter | 12.5mm |
Main hoisting line capacity | 35m |
Power Unit | |
Model | ZS1115 desiel engine |
Rated power | 14.7kw/2200rpm |
Mud pump | |
Rated flow | 160L/min |
Rated pressure | 1.3Mpa |
Driving power | 5.15kw |
Main machine weight | 190kg |
Demension | 1110*725*965mm |
Drill Pipe | |
Drill pipe length | 4.2m |
Drill pipe diameter | 42/50/60mm |
Chassis | |
Model | 95Hp light truck |
Drive mode | 4X2 |
Power Model | ZS1115E2 |
Emission standard | Euro-5 |
Rated power | 70HP |
Rotating speed | 3200rpm |
Stabilizing Jack | |
2 front jacks and 2 rear jacks. | |
Type | Hydraulic |
Stroke | 350 mm |
Dimensions | |
Overall length | 6300 mm |
Overall width | 2200 mm |
Overall height | 3200 mm |
Certificate
FAQ Q: Are you original manufacturer?
A: Yes, we JCDRILL is a official leading manufacture in drilling machinery in China and we have
the whole series products you need.
Q: Which payment terms are available to us?
A: T/T term or L/C term. On T/T term, 30% down payment is required in advance, and 70% balance shall be settled before shipment.On L/C term, a 100% irrevocable L/C without "soft clauses" can be accepted.
Q: Which Incoterms 2010 terms can we work?
A: We JCDRILL are a professional and international company, accept all Incoterms 2010 terms, normally we work on FOB, CIF, CFR,CIP.
Q: How long will the delivery time take?
A: Normally mud pump products will take about 3-15 days to produce the ordered machines. Most of the time, we can have an immediate delivery of our regular machines in 15 days.
Q: How about after sales service?
A: 365×24 Year-round Service We are committed to year-round 24-hour service even during holidays, in line with our policy of always providing "a response within 15 minutes and job completion within 24 hours."
Q:Spare Parts When You Need Them
A:We have spare parts centers across continents that stock specialist spare parts. We promise that spare parts will be delivered within 72 hours or no more than one week.