Customization: | Available |
---|---|
Certification: | CE, ISO 9001:2000 |
Condition: | New |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
>>AK220 adopts multiple drilling angles, which is suitable for corner drilling of complex sites such as foundation pits and slopes.
>>The full hydraulic telescopic boom can reach 30m, which can be operated by two people, saving manpower and simple process. >>Crawler-type walking, suitable for various working environments, the power head is driven by dual hydraulic motors, with large torque and fast hole formation. >>It can be steered arbitrarily in 360°, and the punching angle can be 90° vertical to the ground to 65° elevation. Welcome to customize and process |
![]() |
Item | Unit | AK220 |
Maximum Lift Height | m | 22 |
Engine | KW | 118 |
Motor | KW | 55 |
Control Method | Hydraulic Direct Control Two-way | |
Dust Removal Method | Dry Dust Removal 12 Filter Elements | |
Control Valve | Multi-way Valve | |
Rotary Motor | Cycloid | |
Travel Motor | With Brake Plunger | |
Rotary Power Head | Dual Motor | |
Maximum Swing Torque | N.M | 5600 |
Rotation Speed | Three-speed Transmission | |
Cylinder | GB | |
Swivel Support | GB | |
Way Of Advancement | Motor + Double Chain | |
Propulsion Motor | With Brake | |
Propulsion Beam Structure | GB | |
Maximum Hole Diameter | mm | 219 |
Maximum Drilling Depth | m | 70 |
Oil Pump | Lron Shell High Pressure | |
Telescopic Boom Material | Bending And Welding Of Fine-grained High-strength Steel Plates | |
Telescopic Boom | Oval Arms, Three-section Telescopic | |
Upper Body Rotation | 360° (Dual Brake) | |
Hydraulic Support | Lower Frame Support, High-strength Hydraulic Support, Leveling | |
Chassis | Reinforced Excavator Chassis, Maintenance-free With Four Wheels And One Belt | |
Heat Sink | Composite Radiator + Independent Oil Diffuser | |
Working Platform Rotation | Worm Gear National Standard | |
Safety Equipment | Emergency Stop Switch, Large Flow Proportional Balance Valve Group, Two-way Hydraulic Lock, Hydraulic Explosion-Proof Device, Etc. | |
Travel Motor | TM40 | |
Dimensions | mm | 12400*3000*2760 |
Total Weight | T | 28 |
Q: Are you original manufacturer? |
Q: Which payment terms are available to us? |
Q: Which Incoterms 2010 terms can we work? |
A: Yes, we JCDRILL is a official leading manufacture in drilling machinery in China and we have the whole series products you need. |
A: T/T term or L/C term. On T/T term, 30% down payment is required in advance, and 70% balance shall be settled before shipment. On L/C term, a 100% irrevocable L/C without "soft clauses" can be accepted. |
A: We JCDRILL are a professional and international company, accept all Incoterms 2010 terms, normally we work on FOB, CIF, CFR, CIP. |
Q: How long will the delivery time take? |
Q: How about after sales service? |
Q:Spare Parts When You Need Them |
A: Normally mud pump products will take about 3-15 days to produce the ordered machines. Most of the time, we can have an immediate delivery of our regular machines in 15 days. |
A: 365×24 Year-round Service |
A:We have spare parts centers across continents that stock specialist spare parts. We promise that spare parts will be delivered within 72 hours or no more than one week. |
![]() TWD |
TWD![]() TWD |
![]() |