Customization: | Available |
---|---|
After-sales Service: | Provided |
Warranty: | 1 Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Item
|
Unit
|
JCD150
|
Drill system and operation
|
|
Hydraulic
|
Hole Diameter
|
mm
|
BQ,NQ,HQ
|
Hole Depth
|
m
|
200,150,120
|
Dimension
|
mm
|
2750*1500*1650
|
Weight
|
Kgs
|
2300
|
Winch
|
||
Lifting force of hoist
|
Kgs
|
400-500
|
Length of steel wire rope
|
m
|
50
|
Speed
|
|
adjustable
|
Rotation
|
||
Rotation Torque
|
Nm
|
850
|
Rotation Speed- adjustable
|
rpm
|
500
|
Rotary Head Swing out
|
|
Mechanical swing out
|
Feed&Mast
|
||
Feed Stroke
|
mm
|
2000
|
Drill pipe Length
|
mm
|
1500-2000
|
Control-Mast
|
|
Mast compensation,two cylinder clamp
|
Mud pump
|
||
Model
|
|
BW160 Hydraulic driven
|
Flow rate
|
L/Min
|
160
|
Pressure
|
Bar
|
8
|
Engine
|
||
Diesel Engine type
|
|
HUADONG
|
Engine Model
|
|
HD490
|
Rated Power
|
Kw/Hp
|
48/65
|
Cooling Method
|
|
Water/radiator/Fan
|
Optional Parts
|
||
Safty cage
|
|
On mast/removable
|
Engine
|
|
Yanmar 3TNV88
|
Hydraulic Clamp
|
|
5cylinder clamp
|
Q: Are you original manufacturer?
|
Q: Which payment terms are available to us?
|
Q: Which Incoterms 2010 terms can we work?
|
A: Yes, we JCDRILL is a official leading manufacture in drilling machinery in China and we have the whole series products you need.
|
A: T/T term or L/C term. On T/T term, 30% down payment is required in advance, and 70% balance shall be settled before shipment.On L/C term, a 100% irrevocable L/C without "soft clauses" can be accepted.
|
A: We JCDRILL are a professional and international company, accept all Incoterms 2010 terms, normally we work on FOB, CIF, CFR,CIP.
|
Q: How long will the delivery time take?
|
Q: How about after sales service?
|
Q: Spare Parts When You Need Them
|
A: Normally mud pump products will take about 3-15 days to produce the ordered machines. Most of the time, we can have an immediate delivery of our regular machines in 15 days.
|
A: 365×24 Year-round Service We are committed to year-round 24-hour service even during holidays, in line with our policy of always providing "a response within 15 minutes and job completion within 24 hours."
|
A:We have spare parts centers across continents that stock specialist spare parts. We promise that spare parts will be delivered within 72 hours or no more than one week.
|