| Customization: | Available |
|---|---|
| After-sales Service: | Free Online Technical Support |
| Warranty: | 1year |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
| Payment Methods: |
|
|---|---|
| Support payments in USD |
| Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
|---|
| Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
|---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency

The rig uses the tractor diesel engine as the working power of the rig. The rig working part is integrated with the tractor. The tractor is the rig, the transportation machine, and the working power of the rig. When going to the work site, the tractor has the transportation transfer capability. The air compressor can be mounted, which saves the investment of the vehicle, lowers the cost and makes the work more convenient. It is also equipped with a tricycle to load the drill pipe.
| The weight | 7.2T | Drill pipe diameter | Φ76 Φ89 mm |
| The hole diameter | 140-325mm | Drill pipe length | 1.5m 2.0m 3.0m |
| Drilling depth | 300m | Rig lifting force | 18T |
| One-time advance length | 3.3m | Rapid rise speed | 22m/min |
| Equipped capacitor | 66.5kw | Fast feeding speed | 40m/min |
| Hoisting force of winch | 2T | The penetration efficiency | 15-35m/h |
| Using air pressure | 1.7-3.0MPA | Swing torque | 5700-7500N.m |
| Air consumption | 17-36m³/min | Dimension | 2500×2000×2800 |
| Swing speed | 45-70rpm | Equipped with hammer | Medium and high wind pressure series |
| The engine brand | Yiqi engine | ||
![]() |
![]() |
![]() |







|
Q: Are you original manufacturer? |
Q: Which payment terms are available to us? |
Q: Which Incoterms 2010 terms can we work? |
|
A: Yes, we JCDRILL is a official leading manufacture in drilling machinery in China and we have the whole series products you need. |
A: T/T term or L/C term. On T/T term, 30% down payment is required in advance, and 70% balance shall be settled before shipment. On L/C term, a 100% irrevocable L/C without "soft clauses" can be accepted. |
A: We JCDRILL are a professional and international company, accept all Incoterms 2010 terms, normally we work on FOB, CIF, CFR, CIP. |
|
Q: How long will the delivery time take? |
Q: How about after sales service? |
Q:Spare Parts When You Need Them |
|
A: Normally mud pump products will take about 3-15 days to produce the ordered machines. Most of the time, we can have an immediate delivery of our regular machines in 15 days. |
A: 365×24 Year-round Service |
A:We have spare parts centers across continents that stock specialist spare parts. We promise that spare parts will be delivered within 72 hours or no more than one week. |