Customization: | Available |
---|---|
After-sales Service: | Free Online Technical Support |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Introduction of JCD150
>> JCD150 Full Hydraulic Portable Drilling Rig is a kind of light rig designed for geological exploration in remote area difficult to enter.
>> It is mainly suitable for diamond drilling with wire line coring technique. The rig consists of diesel power unit, hydraulic system, control panel, mast, main winch, wireline winch, drill head, feed system, footclamp, etc.
>> The rig is completely hydraulic driven for all its surface coring function. Fission style design makes the rig in good assemblability and disassemblability, facilitating transportation to most inaccessible areas. Robust structure plus exact control system ensures high penetration rate and outstanding reliability.
>> JCD150 can be operated in unconsolidated layer, and the slag can be discharged under by mud,It suitable for drilling complicated geological conditions.
|
Rotary Head
The rotary head with imported cycloid motor has large torque and long service life, and avoid the stuck drilling.
The drilling speed can be adjusted flexibly according to different rock formations. The imported rotary seal has good sealing performance and long service life. The water swivel can realize both mud and air drilling. |
Control Panel
Full hydraulic control, integrated operation console, manual direct-controlled hydraulic operating system has reliable performance, simple maintenance, and easy operation of the drilling rig.
It's designed for quick feeding and lifting operations, reducing auxiliary time and improving work efficiency. |
>> Full Hydraulic and Drill Head model. The drill head rotation is realized with hydraulic pumps driven by diesel engines; this also makes the feeding hydraulic cylinder system realize its full stroke feeding in both higher and lower speed. >> Centralized control console is suitable for each manipulation and control. Rapid pulling and lifting reduce the auxiliary time and enhance the work efficiency. >> It's a hydraulic rotary drilling rig with directional circulation. It can equipped with BW160 mud pump which adopts the slurry as the washing fluid and can drill on clay, sand and rock if it is equipped with suitable drilling bit. >> The power of drilling rig comes from a Huadong engine,40kw engine drives the large displacement high pressure plunger pump and it is characterized by powerful dynamic and stable performance. |
>> New hydraulic system with mobile hydraulic components,highly integrated valve block functions, complete circuit protection,simple oil circuit, the weight is lighter, extremely low hydraulic system failure rate,significantly reduced operating costs. >> With Good dismantlability. The rig is adopted split type in design, including power unit, hydraulic oil tank,manipulationplatform and operation mechanism, i.e. the drilling section. So they are in light weight and can be carried by man power or animal power. The rig can be applied and performed in narrow space for drilling of hole at 45°-90° with stronger adaptability. >> High power density, in light weight.quiet, energy saving, environmental protection. Fast response, large torque, adjustable speed,strong adaptability, fully sealed water-cooled design,stable startup, easy to realize smart control. |
Item | Unit | JCD150 |
Drill system and operation | ||
Hole Diameter | mm | BQ,NQ,HQ |
Hole Depth | m | 200,150,120 |
Dimension | mm | 2750*1500*1650 |
Weight | Kgs | 2300 |
Winch | ||
Lifting Force Of Hoist | Kgs | 400-500 |
Length Of Steel Wire Rope | m | 50 |
Speed | Adjustable | |
Rotation | ||
Rotation Torque | Nm | 850 |
Rotation Speed - Adjustable | RPM | 500 |
Rotary Head Swing Out | Mechanical Swing Out | |
Feed&Mast | ||
Feed Stroke | mm | 2000 |
Drill pipe Length | mm | 1500-2000 |
Control-Mast | Mast Compensation,Two Cylinder Clamp | |
Mud Pump | ||
Model | BW160 Hydraulic Driven | |
Flow Rate | L/Min | 160 |
Pressure | Bar | 8 |
Engine | ||
Diesel Engine Type | HUADONG | |
Engine Model | HD490 | |
Rated Power | KW/HP | 48/65 |
Cooling Method | Water/Radiator/Fan | |
Optional Parts | ||
Safty Cage | On Mast/Removable | |
Engine | Yanmar 3TNV88 | |
Hydraulic Clamp | 5cylinder clamp |
>> Pre-sale service
>> Acting as a good adviser, our well-trained sales groups and professional technical team propose most rational solutions for our valued client as per practical project requirement.
>> Select suitable model & matched equipment.
>> Strong technical support. Reply clients' questions within 24 hours. |
>> Service During Sales
>> We have responsible team from raw material to finished products, and guarantee 100% pass rate.
>> Design and manufacture products basis of client's special equirement. >> Inspect each machine & matched accessories strictly before delivery >> Timely inform client of production progress. |
>> After Sales Service
|
Q: Are you original manufacturer? | Q: Which payment terms are available to us? | Q: Which Incoterms 2010 terms can we work? |
A: Yes, we JCDRILL is a official leading manufacture in drilling machinery in China and we have the whole series products you need. | A: T/T term or L/C term. On T/T term, 30% down payment is required in advance, and 70% balance shall be settled before shipment.On L/C term, a 100% irrevocable L/C without "soft clauses" can be accepted. | A: We JCDRILL are a professional and international company, accept all Incoterms 2010 terms, normally we work on FOB, CIF, CFR,CIP. |
Q: How long will the delivery time take? | Q: How about after sales service? | Q: Spare Parts When You Need Them |
A: Normally mud pump products will take about 3-15 days to produce the ordered machines. Most of the time, we can have an immediate delivery of our regular machines in 15 days. | A: 365×24 Year-round Service We are committed to year-round 24-hour service even during holidays, in line with our policy of always providing "a response within 15 minutes and job completion within 24 hours." | A:We have spare parts centers across continents that stock specialist spare parts. We promise that spare parts will be delivered within 72 hours or no more than one week. |