Customization: | Available |
---|---|
After-sales Service: | Provided |
Warranty: | 1 Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
promotional engineering soil sampling drilling rig equipment for investigation
APPLICATION
The XY-42A spindle type core drilling rig can be applied to coring drilling by using tungsten-carbide-tipped bit and diamond bit. It is also called surface core drill rig in general place. It can be also used to engineering geological exploration, hydro-geological, water well drilling and big foundation hole as well as basic piling hole.
XY-44A drilling rig's main features:
1, the drill has more speed series (12 forward 2 reverse) and a reasonable speed range, low speed torque (up to 8000N.m), both for alloy, diamond core drilling, is also suitable for Engineering geological survey, hydrological well drilling and foundation pile construction.
2, vertical shaft through-hole diameter (93mm), double cylinder hydraulic feed, longer travel (up to 600mm), process adaptability, especially suitable for larger diameter drill pipe coring (upper coring) drilling, there Help to improve drilling efficiency.
3, using Tsinghua Wanliyang 6T46 gearbox, the model gearbox broad match in Futian, JAC, Kama, Wuzheng and other truck models. Technology is mature, stable quality, overload capacity, service stations and accessories throughout the country.
4, the hydraulic chuck for the disc spring chuck, hydraulic cylinder release, three kava automatic centering hydraulic chuck.
5, the hydraulic system uses gear pump oil supply, easy to install, easy to use, less power consumption, hydraulic system, low oil temperature, stable work. The system is equipped with a hand pump, the pump can still be used when the power machine can not work out of the hole drill.
6, powered by a steam Xichai 4110 (81 kW) naturally aspirated engine, Guangxi Yuchai 4110 (105 kW) turbocharged engine optional.
7, low center of gravity drilling machine, moving a long distance (460mm), fixed firmly, high-speed drilling stability.
8, with a shock instrument, which will help grasp the situation inside the hole. Less manipulation of hands, flexible manipulation.
Drilling ability | ||||
Core drilling | ||||
Drill rod category | Drill rod specifications(mm) | Drilling depth(m) | ||
Domestic drill pipe | Thickened within | 42 | 1400 | |
50 | 1000 | |||
60 | 830 | |||
Cord Coring | 55.5 | 1250 | ||
71 | 1000 | |||
89 | 800 | |||
DCDMA drill pipe | BQ Drill pipe | 1300 | ||
NQ Drill pipe | 1000 | |||
HQ Drill pipe | 750 | |||
PQ Drill pipe | 420 | |||
Thickened outside | 60mm | 800 | ||
73mm | 500 | |||
89mm | 300 | |||
Drilling angle | 0°~360° | |||
Power machine | Model | Power | Rotating speed | |
(1)Motor | Y225S-4 | 37KW | 1480 r/min | |
(2)Diesel engine | CA4110 | 81KW | 2800 r/min | |
Revolver | ||||
Type: Double hydraulic cylinder into the mechanical rotary | ||||
Vertical shaft diameter | φ93 | |||
Vertical axis speed | ||||
Forward(r/min) | 60/90/166/272/379/481/183/296/514/835/1164/1476 | |||
Reverse(r/min) | 63/198 | |||
Vertical shaft maximum torque | 8000N·m | |||
Vertical axis travel | 600mm | |||
Vertical axis of the largest lifting force | 125KN | |||
Vertical shaft maximum pressure | 90KN | |||
Hoist | ||||
Type: planetary gear, handbrake | ||||
Rope diameter | φ18.5mm | |||
Reel wire rope capacity | 95m (winding seven) | |||
Single rope maximum lifting force | 45KN | |||
Rope lift speed | ||||
Reel linear speed (m/s) | 0.7-2.68m/s Twelve | |||
(The third floor) | ||||
Clutch | ||||
Type: Automotive single-chip dry friction clutch (with 6T46 transmission package) | ||||
Hydraulic system | ||||
System pressure | ||||
Preset pressure | 20Mpa | |||
The highest pressure | 25Mpa | |||
Displacement | 20ml/r | |||
Frame | ||||
Type: Skid (with sliding base) | ||||
Drill back trip | 460mm | |||
Leave the hole open | 260mm | |||
Overall dimensions (L × W × H) | 3050*1100*1920mm | |||
Drill weight (excluding power machine) | 2300kg |
Service
In our after sales service system, We establish perfect control system strictly according to ISO-9000 series, in this system, technology date and problem solve solution and preventive measures will be provided in any maintain project, all the spare parts will be used in new OEM products with installation instructions, packing list, manufacturer's instruction, qualification and Warranty certificate.
We provide "one equipment & one case, endless service, namely the after sales service begin from the order confirmation, last for the working life of the equipment.
Warranty |
Spare parts |
Every equipment issued shall enjoy a one-year/2000 working hour warranty period, during which we will repair or replace the defective parts free of charge if material or process defects occur and spare parts are in normal working condition. |
JCDRILL is dedicated to provide our clients with genuine spare parts with the highest quality,exact fitness and appropriate function.with our global distributor network,you are guaranteed with fast deliveries and services
|
1.Q: Are you original manufacturer?
A: Yes, we JCDRILL is a official leading manufacture in drilling machinery in China and we have the whole series products you need.
2.Q: How long will the delivery time take?
A: Normally mud pump products will take about 3-15 days to produce the ordered machines. Most of the time, we can have an immediate delivery of our regular machines in 15 days.
3.Q: Which payment terms are available to us?
A: T/T term or L/C term. On T/T term, 30% down payment is required in advance, and 70% balance shall be settled before shipment. On L/C term, a 100% irrevocable L/C without "soft clauses" can be accepted.
4.Q: How about after sales service?
A: 365×24 Year-round Service
We are committed to year-round 24-hour service even during holidays, in line with our policy of always providing "a response within 15 minutes and job completion within 24 hours."
5.Q: Which Incoterms 2010 terms can we work?
A: We JCDRILL are a professional and international company, accept all Incoterms 2010 terms, normally we work on FOB, CIF, CFR, CIP.
8.Q:Spare Parts When You Need Them
A:We have spare parts centers across continents that stock specialist spare parts. We promise that spare parts will be delivered within 72 hours or no more than one week.
Call us and we'll get back to you as soon as possible !