Customization: | Available |
---|---|
After-sales Service: | Provided |
Warranty: | 1 Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
CWD180 Multi-functional track mounted water well drilling rig
CWD180 Multi-functional track mounted water well drilling rig is a efficient,multi-function full hydraulic water well drilling rig.It is high efficiency because of having a larger torque of the turntable and is mainly used for water well in industry and agriculture, national defense building foundation, geological exploration, geothermic well and other foundation working, it is popular at home and abroad.
Quality Products Beautiful Price Excellent Service
COMPACT DIMENSIONS
EXTENDING UNDERCARRIAGE
STRONGER FRAME
SIMPLE CONTROL
SEASY MAINTENANCE
VERSATILITY
|
Right elevation | Left elevation | Front elevation |
PRODUCTS SPECIFICATION
1 | Geology Drilled | All kinds | |
2 | Drilling Type | DTH&Mud Rotary | |
3 | Drill System and Opertion | Hydrualic | |
4 | Hole Diameter | mm | 90-305 |
5 | Hole Depth | m | 180 |
6 | Rotation Torque | N/M | 4200-5600 |
7 | Rotation Speed | rpm | 0-100 |
8 | Drill Pipe Diameter | mm | 76/89 |
9 | Drill Pipe Lenght | mm | 3000 |
10 | Max.Feed Speed | M/min | 0-25 |
11 | Max.Lifting Speed | M/min | 5-14 |
12 | Feed Stroke | mm | 5200 |
13 | Max.Lifting Force | Ton | 12 |
14 | Max.Pulldown Force | Ton | 4 |
15 | Lifting Force of Hoist | T | 1.5 |
16 | Lifting Height of Tool Winch | m | 40 |
Engine | |||
17 | Diesel Engine Type | Quanchai | |
18 | Rated Horse Power | Kw | 55 |
19 | Elecrtical System | Volt | 24 |
Compressor required(Optional) | |||
20 | Compressor Type | Rotary Screw/Movable | |
21 | Pressure Required | Mpa | 1.05-4.5 |
22 | Air Consumption | m³/min | 16-60 |
Mud pump(Optional) | |||
23 | Type | Hydrualic | |
24 | Model | BW250 | |
25 | Stroke | mm | 110 |
26 | Displacement | L/Min | 250 |
27 | Discharge Pressure(Mpa) | Mpa | 2.5-7 |
28 | Suction Tube Diameter | mm | 76 |
29 | Discharge Pipe Diameter | mm | 51 |
Dimension | |||
30 | Net Weight | T | 4.8 |
31 | Shipping Lenght | mm | 3600 |
32 | Shipping Width | mm | 1700 |
33 | Shipping Height | mm | 2150 |
34 | Ground Clearance | mm | 300 |
PRODUCT CONFIGURATION
Famous Hydraulic Control Valve | YUCHAI 70KW Engine | High power hydraulic pump |
High Hydraulic Support Leg | Heavy Duty Rubber Crawler | 1.5Ton Hydraulic Tool Winch |
PRODUCTS LOADING
FAQ
Q: Are you original manufacturer? |
Q: Which payment terms are available to us? |
Q: Which Incoterms 2010 terms can we work? |
A: Yes, we JCDRILL is a official leading manufacture in drilling machinery in China and we have the whole series products you need.
|
A: T/T term or L/C term. On T/T term, 30% down payment is required in advance, and 70% balance shall be settled before shipment. On L/C term, a 100% irrevocable L/C without "soft clauses" can be accepted. |
A: We JCDRILL are a professional and international company, accept all Incoterms 2010 terms, normally we work on FOB, CIF, CFR, CIP.
|
Q: How long will the delivery time take? |
Q: How about after sales service? |
Q:Spare Parts When You Need Them
|
A: Normally mud pump products will take about 3-15 days to produce the ordered machines. Most of the time, we can have an immediate delivery of our regular machines in 15 days.
|
A: 365×24 Year-round Service |
A:We have spare parts centers across continents that stock specialist spare parts. We promise that spare parts will be delivered within 72 hours or no more than one week.
|
RELATED PRODUCTS
TWD200 Trailer Mounted 200m Water Well Drillling Rig |
CSD200 Truck Mounted 200m Water Well Drilling Rig |
JXY200 Vertical Spline 200m Water Well/Core Drilling Rig |