| Customization: | Available |
|---|---|
| After-sales Service: | Provided |
| Warranty: | 1 Year |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
| Payment Methods: |
|
|---|---|
| Support payments in USD |
| Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
|---|
| Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
|---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
AK-80 construction Anchor Drilling rig is a full hydraulic operated top drive power head drilling machine.


| No. | Specification | Code |
| 1 | Hole depth | 80-100m |
| 2 | Hole diameter | 200-230 mm |
| 3 | Drill rod | 89/114×1500 mm |
| 4 | Hole angle range | 0-120° |
| 5 | Rotation Speed | 5-180 r/min |
| 6 | Torque | 3500NM |
| 7 | Feeding stroke | 1800mm |
| 8 | Mast slide stroke | 500mm |
| 9 | Lifting force | 45 kN |
| 10 | Max.Feed Foce | 30 kN |
| 11 | Hydraulic pressure | 18 Mpa |
| 12 | Motor | Y200L-4 |
| 13 | Power | 30Kw |
| 14 | Size | 3400×1000×1500 mm |
| 15 | Weight | 1700 kg |
| 16 | Weight of the heaviest Part | 200 kg |








|
Q: Are you original manufacturer? |
Q: Which payment terms are available to us? |
Q: Which Incoterms 2010 terms can we work? |
|
A: Yes, we JCDRILL is a official leading manufacture in drilling machinery in China and we have the whole series products you need. |
A: T/T term or L/C term. On T/T term, 30% down payment is required in advance, and 70% balance shall be settled before shipment. On L/C term, a 100% irrevocable L/C without "soft clauses" can be accepted. |
A: We JCDRILL are a professional and international company, accept all Incoterms 2010 terms, normally we work on FOB, CIF, CFR, CIP. |
|
Q: How long will the delivery time take? |
Q: How about after sales service? |
Q:Spare Parts When You Need Them |
|
A: Normally mud pump products will take about 3-15 days to produce the ordered machines. Most of the time, we can have an immediate delivery of our regular machines in 15 days. |
A: 365×24 Year-round Service |
A:We have spare parts centers across continents that stock specialist spare parts. We promise that spare parts will be delivered within 72 hours or no more than one week. |
CTWD |
TWD![]() TWD |
|