| Customization: | Available |
|---|---|
| Certification: | CE, ISO 9001:2000 |
| Condition: | New |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
| Payment Methods: |
|
|---|---|
| Support payments in USD |
| Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
|---|
| Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
|---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
CWD300 Multi-functional track mounted water well drilling rig
>> The rotary head,have two gear,rotation speed is 45-115rpm stepless adjustment and the rotary torque is 4200-5600Nm.
>> The pulling force can be regulated and controlled, which adapt the machine to deep hole drilling.
>> It can set up a generator which is convenient to welding or illuminate for work at night.
>> Main winch are available on the rig so it is high efficiency when the rig drill on mud rock and on the weathering formation.
>> The main drive of rig is hydrulic and the four landing legs and drilling tower are hydraulic controlled. Transfer case and mud pump clutch system are also hydraulic operated.
>> The tools winch winch is used for auxiliary lifting and casin.
>> The Hydraulic auxiliary functions are easy and efficient for guide extension, boom swing, boom lift, guide dumping.
>> Competitive in price, low cost of maintain. 
|
Quality Products Beautiful Price Excellent Service
COMPACT DIMENSIONS
EXTENDING UNDERCARRIAGE
STRONGER FRAME
SIMPLE CONTROL
EASY MAINTENANCE
VERSATILITY
|
![]() |
![]() |
![]() |
![]() |
| Right elevation | Left elevation | Front elevation |

| 1 | Geology drilled | All kinds | |
| 2 | Drilling Type | DTH & Mud Rotary | |
| 3 | Drill system and operation | Hydraulic | |
| 4 | Hole Diameter | mm | Φ105-Φ450 |
| 5 | Hole Depth | m | 300 |
| 6 | Rotation Torque | N/M | 3500-8500 |
| 7 | Rotation Speed | rpm | 0-115 |
| 8 | Drill pipe diameter | mm | 89/102/114 |
| 9 | Drill pipe length | mm | 3000-4500 |
| 10 | Max. Feed Speed | M/min | 0-25 |
| 11 | Max. Lifting Speed | M/min | 5-14 |
| 12 | Max.Feed Stroke | mm | 3550 |
| 13 | Max.Pull back capacity | Ton | 15 |
| 14 | Max.Pulldown Force | Ton | 4 |
| 15 | Lifting force of hoist | T | 1.5 |
| 16 | Lifting height of tool winch | m | 40 |
| Engine | |||
| 17 | Diesel Engine type | YUCHAI | |
| 18 | Rated Horse power | Kw | 90 |
| 19 | Electrical System | Volt | 24 |
| Compressor required(Optional) | |||
| 20 | Compressor Type | Rotary Screw/Movable | |
| 21 | Pressure Required | Mpa | 1.05-4.5 |
| 22 | Air consumption | m³/min | 16-60 |
| Mud Pump(Optional) | |||
| 23 | Type | Hydrulic | |
| 24 | Model | BW450 | |
| 25 | Stroke | mm | 110 |
| 26 | Displacement | L/Min | 450 |
| 27 | Discharge pressure (Mpa) | Mpa | 2-5 |
| 28 | Suction tube diameter | mm | 76 |
| 29 | Discharge pipe diameter | mm | 51 |
| Dimension | |||
| 30 | Net Weight | T | 8.5 |
| 31 | Shipping Length | mm | 5000 |
| 32 | Shipping Width | mm | 1990 |
| 33 | Shipping Height | mm | 2550 |
| 34 | Ground Clearance | mm | 320 |













|
Q: Are you original manufacturer? |
Q: Which payment terms are available to us? |
Q: Which Incoterms 2010 terms can we work? |
|
A: Yes, we JCDRILL is a official leading manufacture in drilling machinery in China and we have the whole series products you need. |
A: T/T term or L/C term. On T/T term, 30% down payment is required in advance, and 70% balance shall be settled before shipment. On L/C term, a 100% irrevocable L/C without "soft clauses" can be accepted. |
A: We JCDRILL are a professional and international company, accept all Incoterms 2010 terms, normally we work on FOB, CIF, CFR, CIP. |
|
Q: How long will the delivery time take? |
Q: How about after sales service? |
Q:Spare Parts When You Need Them |
|
A: Normally mud pump products will take about 3-15 days to produce the ordered machines. Most of the time, we can have an immediate delivery of our regular machines in 15 days. |
A: 365×24 Year-round Service |
A:We have spare parts centers across continents that stock specialist spare parts. We promise that spare parts will be delivered within 72 hours or no more than one week. |