Customization: | Available |
---|---|
After-sales Service: | Provided |
Warranty: | 1year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Specification | Unit | Data |
Complete Machine | ||
Type | Double-Flighted Screw/Oil cooler | |
Nominal volume flow | m 3/min | 18 |
635 | CFM | |
Rated Discharge Pressure | 17 | Bar |
psi | 246 | |
Press Stage | stage | 2 |
Gas tank Capacity | L | 96 |
Diesel Engine | ||
Manufacturer | YUCHAI | |
Type | YC6J220-T300 | |
Cylinder | 6 | |
Rated Output Power | KW/HP | 162/220 |
Working Speed rpm | RPM | 1900-1400 |
Coolant Volume | L | 54 |
Oil Volume | L | 22 |
Voltage of Electric System | 6-QW-165MFx2 | |
Fuel Tank Capacity | L | 550 |
Sound Level | dBA | 83±3 |
Compressor | ||
Lubricant Capacity | L | 196 |
Q'ty & Spe of air supply valve | 1-G2'',1-G1'' | |
Weight&Dimension | ||
Weight(Without fuel) | KG | 2700 |
Length(Skid) | mm | 2800 |
Width(Skid) | mm | 1800 |
Heigth(Skid) | mm | 1780 |
Length(wagon, towbar raised) | mm | 3200 |
Width(wagon, towbar raised) | mm | 1800 |
Heigth(wagon, towbar raised) | mm | 2120 |
Tyre | 4Wheels,225/80R15 |
Q: Are you original manufacturer?
|
Q: Which payment terms are available to us?
|
Q: Which Incoterms 2010 terms can we work?
|
A: Yes, we JCDRILL is a official leading manufacture in drilling machinery in China and we have the whole series products you
need. |
A: T/T term or L/C term. On T/T term, 30% down payment is required in advance, and 70% balance shall be settled before shipment.On L/C term, a 100% irrevocable L/C without "soft clauses" can be accepted.
|
A: We JCDRILL are a professional and international company, accept all Incoterms 2010 terms, normally we work on FOB, CIF, CFR,
CIP. |
Q: How long will the delivery time take?
|
Q: How about after sales service?
|
Q:Spare Parts When You Need Them
|
A: Normally products will take about 3-15 days to produce the ordered machines. Most of the time, we can have an immediate
delivery of our regular machines in 15 days. |
A: 365×24 Year-round Service We are committed to year-round 24-hour service even during holidays, in line with our policy of
always providing "a response within 15 minutes and job completion within 24 hours." |
A:We have spare parts centers across continents that stock specialist spare parts. We promise that spare parts will be delivered
within 72 hours or no more than one week. |