Customization: | Available |
---|---|
After-sales Service: | Free Online Technical Support |
Warranty: | 1year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The weight | 7.2T | Drill pipe diameter | Φ76 Φ89 mm |
The hole diameter | 140-325mm | Drill pipe length | 1.5m 2.0m 3.0m |
Drilling depth | 300m | Rig lifting force | 18T |
One-time advance length | 3.3m | Rapid rise speed | 22m/min |
Equipped capacitor | 66.5kw | Fast feeding speed | 40m/min |
Hoisting force of winch | 2T | The penetration efficiency | 15-35m/h |
Using air pressure | 1.7-3.0MPA | Swing torque | 5700-7500N.m |
Air consumption | 17-36m³/min | Dimension | 2500×2000×2800 |
Swing speed | 45-70rpm | Equipped with hammer | Medium and high wind pressure series |
The engine brand | Yiqi engine |
![]() |
![]() |
![]() |
Q: Are you original manufacturer? |
Q: Which payment terms are available to us? |
Q: Which Incoterms 2010 terms can we work? |
A: Yes, we JCDRILL is a official leading manufacture in drilling machinery in China and we have the whole series products you need. |
A: T/T term or L/C term. On T/T term, 30% down payment is required in advance, and 70% balance shall be settled before shipment. On L/C term, a 100% irrevocable L/C without "soft clauses" can be accepted. |
A: We JCDRILL are a professional and international company, accept all Incoterms 2010 terms, normally we work on FOB, CIF, CFR, CIP. |
Q: How long will the delivery time take? |
Q: How about after sales service? |
Q:Spare Parts When You Need Them |
A: Normally mud pump products will take about 3-15 days to produce the ordered machines. Most of the time, we can have an immediate delivery of our regular machines in 15 days. |
A: 365×24 Year-round Service |
A:We have spare parts centers across continents that stock specialist spare parts. We promise that spare parts will be delivered within 72 hours or no more than one week. |