| Customization: | Available |
|---|---|
| After-sales Service: | Provided |
| Warranty: | 1 Year |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
| Payment Methods: |
|
|---|---|
| Support payments in USD |
| Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
|---|
| Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
|---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
JCL1795 | |||
Engine Model No. | QSC8.3-C240 | Percussion frequency(min¹) | 1250 |
Rated power(kW) | 179KW @2200rpm | Feed stroke(mm) | 4000 |
Caterpillar Band Model No. | LG-154 | Feed force(kN) | 48 |
Motor | Double-speed | Retraction force(kN) | 94 |
Tramming speed(Km/h) | 1.8/3.0 | Feed rate(m/min) | 0-18 |
Ground pressure ( N/cm? ) | 6.9 | 0-69 | |
Gradeability(°) | 25 | Retraction rate(m/min) | 0-10 0-72 |
Rotation rate at low gear (r/min) | 0~38,0~62 | Feeding Pattern | Hydro-cylinder + Chain |
Rotation rate at high gear(r/min) | 0~76,0~124 | Clamp range(mm) | 60-219/89-406 |
Torque range at high gear(Nm ) | 9900 | Maximum passing diameter(mm) | 420 |
Torque range at low gear(Nm ) | 17000 | Dimension(mm) | 8500*2290*3100 |
Impact work(N.m ) | 1180 | Weight(T) | 17.5 |
Q: Are you original manufacturer? | Q: Which payment terms are available to us? | Q: Which Incoterms 2010 terms can we work? |
A: Yes, we JCDRILL is a official leading manufacture in drilling machinery in China and we have the whole series products you need. | A: T/T term or L/C term. On T/T term, 30% down payment is required in advance, and 70% balance shall be settled before shipment. On L/C term, a 100% irrevocable L/C without "soft clauses" can be accepted. | A: We JCDRILL are a professional and international company, accept all Incoterms 2010 terms, normally we work on FOB, CIF, CFR, CIP. |
Q: How long will the delivery time take? | Q: How about after sales service? | Q:Spare Parts When You Need Them |
A: Normally products will take about 3-15 days to produce the ordered machines. Most of the time, we can have an immediate delivery of our regular machines in 15 days. | A: 365×24 Year-round Service We are committed to year-round 24-hour service even during holidays, in line with our policy of always providing "a response within 15 minutes and job completion within 24 hours." | A:We have spare parts centers across continents that stock specialist spare parts. We promise that spare parts will be delivered within 72 hours or no more than one week. |