Customization: | Available |
---|---|
After-sales Service: | Provided |
Warranty: | 1 Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
JCM400 fully hydraulic top impact rotary track multifunctional drilling rig, mainly suitable for tunnel pipe shed support holes and pilot survey holes, urban deep foundation pitanchoring holes, grouting reinforcement holes, hydropower stations, railway and highwayslope large tonnage prestressed anchoring holes or drainage holes construction, as well asground source heat pump hole construction; And take into account the construction of small and medium-sized foundation pile holes, water well irrigation holes, and blasting holes. >> Multi-functional drilling. Various drilling techniques can be used on this type of drilling rig, such as impact drilling, down-the-hole drilling, and through-air reverse circulation drilling. cutting, drilling, roller drilling, pipe following drilling, etc. The drilling rig can be equipped with a mud pump, a foam pump, and a generator according to user requirements. The drilling rig is also equipped with a hydraulic winch as standard. |
![]() |
>> Fully hydraulic control is convenient and flexible. The rotation speed, torque, axial pressure, counter axial pressure, propulsion speed, and lifting speed of the drilling rig can be adjusted at any time to meet the needs of different drilling tool usage conditions and construction processes, Top drive rotation, impact, and propulsion lifting are convenientfor connecting and unloading drill rods, shorten auxiliary time, and also facilitate pipefollowing drilling.
>> High working efficiency. Due to its full hydraulic and top drive impact, rotation, propulsion, and lifting capabilities, it is suitable for various drilling techniques and drilling tools with convenient and flexible operation, fast drilling speed, and short auxiliary time, resulting in high operational efficiency. Drilling costs are lower.
>> High leg track type, High support legs are convenient for loading and transportation, and can be directly loaded without the need for a crane.Crawler walking is a more suitable form of moving on muddy sites.
Specification | Unit | JCM400 | Specification | Unit | JCM400 |
Drilling Specification | Wast dumpling angle | ° | 100 | ||
Rock Hardness | F=6-20 | Hydraulic Winch | |||
Hole Diameter | mm | 115-380 | Winch capacity | T | 1.5 |
Hole Depth | m | 400 | Engine | ||
Hydraulic system pressure | Mpa | 22 | Brand | Weichai | |
Drill Pipe | Model | WP10-330 | |||
Drilling Rod Diameter | mm | 76,89,102,114 | Typed | Water Cooling,6cylinder | |
Drill rod Length | m | 3.4.5.6 | Rated Power | Kw/Rpm | 247/2200 |
Hammer size | Inch | 4"-8" | Fuel tank capacity | L | 120 |
Rotation | Undercarriage | ||||
Rotation Speed | rpm | 60-120 | Undercarriage Rotation angle | ° | 360 |
Max Rotation torgue | Nm | 8000-16000 | Track width | mm | 400 |
Feed System | Ground Clearance | mm | ≥350 | ||
Feeding method | Cylinder+Chain | Oscillation | ° | 10 | |
Feed Stroke | mm | 6.6 | Walking Speed | km/h | 2-3 |
Feed foroe | T | 0-10 | Grade Ability | ° | 20 |
Pull bacl capacity | T | 0-25 | Dust Collector(Optional) | ||
Normal Feeding Speed | M/min | 3.95 | Collecting type | Full hydraulic | |
Fast feeding speed | M/min | 0.5-5.2 | Dimension & Weight | ||
Normal lilting speed | M/min | 19.9 | Shipping Length | mm | 7500 |
Fast lifting speed | M/min | 26.4 | Shipping width | mm | 2250 |
Mast Extension | mm | 1400 | Shipping Height | mm | 2900 |
Mast lifting angle | ° | -15-40 | Weight | kgs | 19000 |
Q: Are you original manufacturer? |
Q: Which payment terms are available to us? |
Q: Which Incoterms 2010 terms can we work? |
A: Yes, we JCDRILL is a official leading manufacture in drilling machinery in China and we have the whole series products you need. |
A: T/T term or L/C term. On T/T term, 30% down payment is required in advance, and 70% balance shall be settled before shipment. On L/C term, a 100% irrevocable L/C without "soft clauses" can be accepted. |
A: We JCDRILL are a professional and international company, accept all Incoterms 2010 terms, normally we work on FOB, CIF, CFR, CIP. |
Q: How long will the delivery time take? |
Q: How about after sales service? |
Q:Spare Parts When You Need Them |
A: Normally mud pump products will take about 3-15 days to produce the ordered machines. Most of the time, we can have an immediate delivery of our regular machines in 15 days. |
A: 365×24 Year-round Service |
A:We have spare parts centers across continents that stock specialist spare parts. We promise that spare parts will be delivered within 72 hours or no more than one week. |