Customization: | Available |
---|---|
After-sales Service: | Provided |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Specification
|
Unit
|
CWD200T
|
||
Geology drilled
|
|
All Kind
|
||
Drilling Type
|
|
DTH & MUD
|
||
Drill system and operation
|
|
Hydraulic
|
||
Hole Diameter
|
mm
|
Φ90-Φ350
|
||
Hole Depth
|
m
|
200
|
||
Rotation Torque
|
Nm
|
5500
|
||
Rotation Speed
|
rpm
|
60-115
|
||
Drill pipe diameter
|
mm
|
76/89/102
|
||
Drill pipe length
|
mm
|
3000
|
||
Max. Feed Speed
|
M/min
|
80
|
||
Max. Lifting Speed
|
M/min
|
40
|
||
Feed Stroke
|
mm
|
3600
|
||
Max. Pull back Capacity
|
T
|
12
|
||
Lifting force of Winch
|
T
|
1.2
|
||
Engine
|
|
|
||
Diesel Engine type
|
|
4Cylinder,water cooling
|
||
Diesel Engine Brand
|
|
Yunnei
|
||
Rated Horse power
|
Kw
|
58
|
||
Compressor required(Optional)
|
|
|
||
Pressure Required
|
Mpa
|
1.5-2.5
|
||
Air consumption
|
m³/min
|
15-30
|
||
Mud Pump(Optional/Separate)
|
|
|
||
Model
|
|
BW250
|
||
Displacement
|
L/Min
|
250
|
||
Discharge pressure (Mpa)
|
Mpa
|
4
|
||
Dimension
|
|
|
||
Net Weight
|
T
|
5300
|
||
Transportation dimension
|
mm
|
4070*1550*2070
|
||
Work Dimension
|
mm
|
3260*2380*6190
|
||
Ground Clearance
|
mm
|
300
|
Q: Are you original manufacturer?
|
Q: Which payment terms are available to us?
|
Q: Which Incoterms 2010 terms can we work?
|
A: Yes, we JCDRILL is a official leading manufacture in drilling machinery in China and we have the whole series products you need.
|
A: T/T term or L/C term. On T/T term, 30% down payment is required in advance, and 70% balance shall be settled before shipment.On L/C term, a 100% irrevocable L/C without "soft clauses" can be accepted.
|
A: We JCDRILL are a professional and international company, accept all Incoterms 2010 terms, normally we work on FOB, CIF, CFR,CIP.
|
Q: How long will the delivery time take?
|
Q: How about after sales service?
|
Q: Spare Parts When You Need Them
|
A: Normally mud pump products will take about 3-15 days to produce the ordered machines. Most of the time, we can have an immediate delivery of our regular machines in 15 days.
|
A: 365×24 Year-round Service We are committed to year-round 24-hour service even during holidays, in line with our policy of
always providing "a response within 15 minutes and job completion within 24 hours." |
A:We have spare parts centers across continents that stock specialist spare parts. We promise that spare parts will be delivered within 72 hours or no more than one week.
|